FI-MM Integration
Material Management
Material Master
Accounting
view
Need to enter
Valuation
class This is link between MM & FI
Ex:
RM-3000
In the Regular process MM People Create: -
(1)
Purchase
Requisition
ME51N
(2)
Purchase Order
ME21N
(3)
Purchase Order
Release
ME28
For Goods Receipt
(MIGO)
(101
Movement type)
RM
Inv a/c Dr
To
GR/IR a/c
[*
We cannot directly post transactions to RM Inv a/c]
There
is dummy entry with GR/IR
OBYC |
---à
|
RM A/C Dr To Party A/C
|
For valuation class 3000 we need to
specify GL A/C. System does not know whether it is RM/Packing etc.
If we assign GL A/C then it
understands.
BSX |
In this process GL A/C will be
assigned system takes GL A/C from BSX Process.
WRX |
---à
|
GR/IR A/C
|
We need to specify one more GL A/C to
give Dr & Cr
Invoice verification:
MIRO |
Final invoice
GR/IR A/C or To vendor A/C
Vendor No à
system takes from P.O
With need to P.O. invoice
verification is created.
Goods Issue:
MB1A |
There are no of ways
To
-à product order
Internal
order
Sales order
¨
262
is for goods return
¨
261
Movement type à create this entry
internally.
Production order à
system understands through Movement type
We
are issuing RM to production.
RM
consumption a/c Dr To RM a/c
261
à
RM Consumption a/c Dr to RM a/c
System takes from BSX process
*. GBB process/VBR (Here we need to
specify GL a/c)
MM Head ---à
Purchase organization
Basic configuration steps:
(1)
Define / create
plant
(2)
Define / Create
storage location
(3)
Define / create
purchase organization
(4)
Assign plant to
company code
(5)
Assign purchase
organization to company code
(6)
Assign purchase
organization to company code
(7)
Create plant
parameters
(8)
Assign company
code for material master module
(9)
Valuation group
assignments
(10) Purchase
order tolerance Group
(11) Goods
Receipt Tolerance Group
(12) Vendor
specific Tolerance Group
(13) Table
169P configuration
(14) Table
169E configuration
(15) Vendor
Master creation (centrally)
(In
FI we created vendor account)
Here we need to create keeping in
view both MM & FI)
(16) Material
Master creation
Step 1
(1) Define
/ Create plant
SPROà
Entire. Structureà Definitionà
logistics à
Generalà
Define, coping, Delete, Check plant
Define
plant
New
entries
Plant
1111
Name
NJ Plant
Address
Title
company
Name this is for company code
Country IN
à SAVE
Each
plant has specific calendar. Based on that calendar factory people work on that
plant.
Calendar 101
--à
SAVE
(2) Define / Create Storage
location OX09
SPROàENT.
Structureà
Definitionà
Material Managementà Maintain Storage
location
Plant 1111
New entries
Storage
location Description
1000
This is for plant
1111
Enter
1000
Address
of storage location
New
entries
No
99
Enter
Title
company
Name for plant 1111
Country IN
SAVE
(3) Maintain Purchase Organization
SPROà
ENT. Structure à Definition à
Material Management à Maintain purchase
orgn.
New entries
Purchase
orgns Desc
1010
For co code 1010
Save
(4) Assignment plant to co. code OX18
SPROà ENT.Structureà assignment à logistics à General à Assign plant to co. code
Assign
NJ
Plant
Save
(5) Assign purchase orgn to co.
code:
SPROà
ENT. Structureà Assignment à
MMà
Assign PO to co. code
Keep cursor on PO
√
Assign
Co. code
Enter save
(6) Assign Purchase Orgn to plant:
-
SPROà
ENT. Structure à Assignment à
MMà
Assign P. orgn to plant
Keep cursor on P. orgn
√
Assign
√NJ
Plant
Enter Save
(7) Creation of plant parameters.
OM18
SPROà MMà Consu based planningà plant
parametersà carrying out overall maintain of plant parameters
Take copy from 0001 plant
Copy
From plant 0001
To plant 1111 & select continue
(8) Assign co code to MM:-
SPROà Logistics General à MMà Basic settings à Maintain Co. code for Material
Management
1010 SAP
India 2004 1[enter here 1 allow
only April validates only server date]
Enter
In Real Time:-
MM
PERIOD FI
PERIOD
EVERY MONTH THEY CLOSE
ABP Based on organization
requirement. We have to select
If we select this then will allow for
back period entries also
i.e. if we are in April we can post
March also.
DBP if not required back dated
postings tick here.
(9) VALUATION GROUP OMWD
SPROà
Material Management à Valuation &
a/c assign à
A/C determination à acct
determination with wizard à Group together
valuation
1111 1010 SAP India 1010
Valuation class defining à
OMSK
All are inbuilt we need not do anything
Define valuation class
Valuation class a/c
category ref
3000
0001
Material Type A/C Category:-
Material
type a/c category
3 ROH 0001
We need to specify Raw Material Type
(10) Define a/c Group for Movement
Type: -
Movement a/c
Modification
101
press F1 we will
get all info
Valuation string WF06
TE KEY
WRX GR/IR CL.A/C
(Assign as TE key & Val. String)
(11) Movement Type OMJJ
E.g.: Take 101
We can see the links to various
transactions 101 MIGO goods movement
If
we select MIGO system understands through this configuration that movement type
is 101
(12) PURCHASE ORDER TOLERANCE
GROUP:-
SPROà Mat. Management à purchasingà purchase order
Select tolerance limit for price
variance
Copy à
0001 PE
0001 SE
ENTER
CO.CODE. ……
ENTER
CO.CODE ……
SAVE
(13) GR Tolerance Group: - OMC0
SPROà
Mat. Management à Inv. Management
and physical inventoryà Goods Receipt à
Set Tolerance Group
Copy
1000
B1
B2
V3
For B1, B2, B3 entry
Save
(14) Vendor specific TR. Group
SPROà MMàlogistics Invoice verificationsà incoming invoiceà configure vendor specific Tolerance
1000 Copy
Enter
co. code
Enter
save
(15) Table
169P configuration:-
SPROà MMà logistic invoice
verification à invoice verification back groundà define automatic status change
0001 copy
Co.
code
Save
(16) 169V configuration: -
SPROà
MMà
Logistics invoice verificationà
incoming invà
maintain default values for tax codes
Copy
0001
Enter
co. code
……
Enter
save
Vendor
Master
(17) Define Attributes for
Material Type: -
SPROà Logistic General à MM basic settings à Material typesà Define Attributes for Material type
[In live by default it should come]
If we select 3ROH at the time of
material master
√3ROH Raw Material
Qty value updation
Valuation area in plant. Qty updation value reqd
1111 √ √
Valuation area = plant
(First √ Material type (Here 3ROH)
Then √ Qty / value updation
Then go to plant 1111
Plant √ √ for qty and value updation
From MM
(18) Vendor Master Record Creation XK01
SAP EASY Access à
logistics à
material management à purchasing à
master dataà
vendorà
centrallyà
create XK01
Vendor Reliance
Co
code 1010
Purchase
Orgn 1010
Acct
group 0002
Enter
Title company
Name Reliance
Country IN
ENTER
ENTER
ENTER
Re
conciliation a/c 900000
Cash
Management A1
Order
Currency INR
[In
real time we should make it mandatory]
Enter
Enter
Save
(19) Creating Material Master
Record
MM01
SAP Easy Accessà
Logistics à
Material Managementà Material Master à
Materialà
create Generalà Immediately MM01
Industry pharmacy
Material type 3ROH RM
√ Select
views
Since
RM no sales views available
If
FIG à
sales views also available
√ Select
all buttons
A/c 1
A/c 2
Costing 1
Costing 2
Plant
1111
Storage
location 1010
Enter
Material
Raw Material
Base
unit each material group ……
In
Real time 500 to 600 measurements are there.
Enter
√ next Screen
(note : Where condition mandatory
enter)
√ MRP1
VD
no planning (within con no RM is Mfg)
Enter
Enter
Forecast
Model constant
Value data
Enter
Enter
Enter
Link
is established here
Valuation class 3000
Moving price √ for RM
ENTER
ENTER
SAVE
Creation of GL account’s in FI
FS00
(1) Raw
material a/c
no
700000
(2) RM
Consumption
(3) GR/IR
A/C 700100
RM:
B/S a/c
√ post
automatically
√ line
item
Sort
key 001
Field status variant G006 Mat a/cs
Save
GR/IR A/C:- B/S A/C
√ Post
Automatically
√ Line
item
Sort
key 001
F.status
variant G045
RM Consumption a/c:-
P & L a/c
√ post
automatically
√ line
item display. Sort key 001
FST.Varient
G003
SAVE
Assignment of BSXGL a/c for MM: OBYC
SPROà
Fin a/cà
GL a/cà
Business Transactionsà Integrationà
Material Managementà Define A/c’sà
for Material Management
√ BSX
Chart of a/c’s ….
Valuation class √
Save
√ accounts
Enter
Valuation
class a/c
Number
3000
700000
Enter
Save
√ WRX
[No
need to select valuation class. For all Material type à
one GR/IR a/c is enough. If client asks we have to create]
700100
GR/IR
√ GBB
General
modification √
Valuation
Modification √
Valuation
class √
Save
Value Modification Gen Mod Value class a/c
0001à(defined
UR m/m) VBR 3000 700200
SAVE
Creation of purchase order: - ME21N
SAP
Easy Accessà
logisticsà
Material Managementà Purchasingà
POà
Create
(Up to 4.6c version ME21)
WE=49
WI=51
WL=50
WN=40
|
For group 001 vendor
Reliance
Purchase Orgn 1010
Co code 1010
Item overview
Material Per Qty Price Currency
854 1 100 INR
ENTER
PLANT
Storage
location …..
√ check
To see PO. ME23
Give PO
no …..
To see Price: - OMX1
√ Line
items
SPROàCOà
Prod. Costingà
Actual costingà activate Material
Ledger
If √ not active
Don’t √ then active
Creation of Goods Receipt
MIGOàGOàGR for purchase Order (MIGO)
SAP Easy Accessà
Logisticsà
Material Managementà Env. Managementà
Goods Movementà GR for POà
For PO
√ Goods
Receipt
√ Purchase
Order ….
Enter
Storage
location for plant
√ Item
Ok
√ check
√ post
FBN1
Co code 1010
Change Intervals
Intervals
No Year From To
50 2004 900000 999999
Save
50 à No. Range for Doc. Type
OBA7
Doc no
To see doc
MB03 à DOC NO …..
ENTER
We can see the material document
To see a/c Doc
Put cursor line item
√ a/c Doc
RM A/C Dr
To GR/IR A/C
Like this values comes to FI
MIRO
We can enter GR/IR no PO NO
INVOICE Date …
Amt 1
PO
No …
Enter
No range for 51 we have to create
Co code …
√ ch. interval
No year
S1 2004 800000 900000
ENTER
Save
Base line date immediately
OBCL
Taxes
Input
Tax code v0
Output
Tax code A0
FI-MM:
Link Tax codes is required. There should
be an interlink between purchase pricing procedure and Tax Procedure
Invoice Verification:
Only simulated but not saved . Since
Tax problem is there
GR
I A/C Dr
To
vendor a/c
Issue of
Goods to Order/Cost centers
Production
Order
Goods Issue MB1A
SAP Easy Accessà
logisticsàMaterial
Mgmt-à
Inv. Managementà Goods Movementà
Goods issue
Movement
Type 201
Plant 1111
Storage
location 1000
Enter
GL
A/C SAME EXP à
since issue is to cost center
Cost
center Prod 99
It will take from our GL
Mat Qty S.loc
854
create No ranges for 49
MB03
We
can see Doc
20 à
Reversal type
To Bring opening Stock:
Bring
balance from legacy to SAP
(Create
same Legacy No 700300)
B/s
a/c
G006
√ PO
automatically
OBYC
√ GBB
0001 BSA 3000 700300
SAVE
MB1C
Mov
type 501
Enter
Mat Qty
854
Save
To see Doc
MB03
SAVE
Once pp is activated i.e. settings
are made we can issue material to production order
******************************
FI-SD Settings:
Basic Configuration:
(1)
Create / Define
sales organization
(2)
Create / Define
Distribution channels
(3)
Create / Define
Divisions
(4)
Assign sales
organizations to company code
(5)
Assign
Distribution channels à Sales
Organization
(6)
Assign Division à
sales organization
(7)
Setup sales area
(8)
Assign sales
organization company code, plant combination
(9)
Create shipping
points
(10) Create
loading points
(11) Assign
loading points in Material Master
(12) Assign
shipping points in Customer Master
End user Transactions
(1) Create customer Master Centrally XD01
(2) Create Material Master finished good [MM01]
(3) Create sales order [VA01]
(4) Create delivery [VC01]
(5) Create packing
(6) Create post goods Issue [VL02]
We are issuing finished goods. Cost
of Goods sold a/c (GBB/VAX) Dr
(7) Billing Doc [VF01]
To Finished goods from BSX a/c
Need
to assign cost of goods sold a/c in OBYC in GBB/VAX
From
PO to VL02 only goods Movement
BILLING DOC:
Separate
setting with VKOA
Here
journal entry comes
VKOA
is purely SD configuration
OBYC
is purely MM configuration
Entry for Sales:
Customer
A/c Dr
To
sales a/c
SAP is providing 5 processes in VKOA.
** Need to verify first KOFI for
combination, if not found verify KOFK
*******4th and 5th
pages are not available
(1) Creation
of Sales organization:
SPROà
ENT. Structureà Definitionà
sales & Distributionà Define, copy,
Delete, Check sales orgn.
√
Define sales orgn
New
entries
Sales
organization 2345
(2) Define,
copy, delete, check Distribution channel
√Define
Distribution channel
New
entries
77 Save
(3) Create
Division:
SPROà ENT. Structureà Definitionà Logistics Generalà Define, copy, Delete, Division
√Define
Division
√New
Entries
(4) Assign
Sales orgn to Co code: -
SPROà
ENT. Structureà Assignmentà
S & D à
Assign sales orgn to Co code
√
1010 SAP India
Assign 2345 sales orgn
√Copy
(5) Assign Dist. Channel to sales
orgn: - DBXK
SPROà
ENT’Sà
Assignà
Sales & Distà Assign D’ Channel
to sales orgn
Sales
orgn 2345
Assign
√77
Dist Channel
(6) Assign Division to sales orgn: OBXA
SPROà
ESTà
Assignà
S & Dà
Assign Division to sales orgn
(7) Setup sales Area OBXG
Config
of sales orgn, Dist. Channel, Division
&
Sales area
SPROà
ENT. Structureà Assignà
S & Dà
Setup sales area
√2345
Assign
√77
D. channel
√Assign
√Division
(8) Assign
sales orgn, Dist. Channel and plant: -
SPROà
ENT. Structureà Assignà
S&Dà
Assign sales orgn, Dist channel, plant
√
sales orgn
√
Assign
√
plant
(9) Shipping
points: -
SPROà
ENT. Structureà Definitionà
logistics Executionà Define, copy,
Delete, Check shipping à Point.
Define
√shipping
point
√New
entries
(10) Loading points: -
SPROà
ENT. Structureà Definitionà
logistics Execution à Maintain loading
point
Shipping
point 1010
Enter
New
entries
Loading
point
20
Enter
Save
(11) Assign
loading point in Material Master: -
MM01
Material
type finished
goods
Enter account information. Once we
enter loading group line is established to Material Master & Loading Group.
Billing Doc
A/C
ACC. Assign Group
(12) Creating
sales order VA01
SAP Easy Accessà
Logistics Generalà Logisticsà
S & Dà
salesà
Create
Order
type …
Enter
(13) Delivery: VL01N
SAP
Easy Accessà
Logisticsà
S & Dà
Shipping & Transportationà
Outbound deliveryà create single DOC
With
Packing
& packing: VL02
(Once we pickup material from stores
then packing)
√post
Goods issue
Post the entry
Cost
of goods sold a/c Dr
To
finished Goods a/c
Billing:
SAP
Easy Accessà
Logistics à
S & D à
Billingà
Billing Docà
Create
Here
we need to enter Delivery Doc.
(** For delivery we need to enter P.O
Number)
------------------------****END OF
DOCUMENT***------------------------------------------
PP-SETTINGS
(1)
Create order type
dependent parameters
(2)
Create BOM
(3)
Create persons for
Responsibility in Cost Centers
(4)
Create work center
(5)
Create Routing
(6)
OPJGà
Configuration
(7)
OPJKà
Configuration
(8)
Create / Define à
Scheduling
(9)
Create schedule
parameters
(10) Create
confirmation parameters
USER STEPS:
(1) Creation
of production order CO01 à
No A/c Entry
(2) Release
production order CO02 à
No A/c Entry
(3) Issue
of Material to production order
RM consumption A/c Dr (GBB/VBR) to RM A/c (From BSX)
(4) Confirmation
of production Order C015
Once
we confirm there is A/c Entry
Finished
goods A/c Dr [BSX]
To
cost of production GBB/AUF [include Material & Material 0H]
(5) Technically
completed production order C012
(6) Goods
Receipt from shop floor to stores
MIGO
(1)
Create
Order Type Dependent Parameters:
-
SPROà Productionà Shop floorà Master Dataà Orderà Define order types Dependent parameters
OPL8
Copy 0001
(All)
√0001
Enter
Plant
1111
Order
type PP01
SAVE
(2)
Creation of
BOM: -
In BOM we need to specify for the
Finished Good à what are the Raw Material req
Create
Raw Material 857
MM01
√Views
Plant 1111
Storage
1000
Enter
Material
858 Raw Material 2
Base
amt CA Material Group 001
Material
class
MRP Type NO
Fore
casting Model 0
Valuation
class 3000
Save
Material
finished. Finished goods
√views
√all
Plant
1111
Material
Group 001
Value
Check up
Valuation
class 7920
Price
control S
SAVE
Stock: - to see stock MM03
Mat
No 854
We can see stock is there or not in
stores. We can get no of units, moving avg price
T.C
MBK
Movement type 561
Plant 1111
Enter
1 Mat 858. 100
Enter
Save
Creation of BOM:
- CS01
SAP Easy Accessà
Logisticsà
Productionà
Master Dataà
BOMà
Bill of Material à Material BOMà
Create CS01
Material type FIGNO
Plant 1111
BOM Usage 1 production
Components Qty
0010 L 854 1
0020 L 858 1
Enter
Save
Creation of personnel for
Responsibility in work center:
-
SPROà
Plant maintain and customer servicesà
maintenance plants, work centers, cost lists and PRTsà
Work Centerà
General Dataà
Define Employee Responsible for work Center
√New
entries
Plant
Name
1111 ABC (Person for 1111)
SAVE
One center can have no of work
centers.
Creation of work center CR01
SAP Easy Accessà
Logisticsà
Production à
Master Dataà
Work Centersà
Work centerà
create
Plant
1111
Work
center name ABC
Work
center category Labor
Enter
Labor Hrs
Person
Responsible ABC
Usage 001
Std
value SAP1
ENTER
√Costing
Cost
centers Prd 99
Setup
Mach. Hrs
Labor Hrs
[** Useful in product costing]
Save
First create activity type KL01. Then in activity type mention
secondary cost element.
ROUTING CA01
SAP Easy Access à
Logisticsà
Productionà
Master Dataà
Routingsà
Routingsà
standard Routingsà create
Here we need to give link how many
hours required for that plant
FINISHED
Plant 1111
Work center plant control key
PP01
ENTER
√Work center
√√operation
√comk allocation
Mat1 Qty
Mat2 Qty
Save
Create Secondary cost element:
Sec.
Cost Element 77777
Valid
from 1.4.2004
Name Lab.Hrs
Cost
element category 43
Through this cost element we need to
create link between cost centerà
cost elementà
Routing
------------------------------
TC OPJG
WORK CENTER
&
ORDER TYPE
|
Plant 1111
√continue
Control key PP01
Task list PC
Usage 1
Dr 1
Nr 1
Base qty 1
Work center ABC LINK and Order type
Operation
0010
Save
√ OPJK
Link:
Order Type, Material availability
check, plant
|
√ Position
Plant 1111
Need to form link between plants 1111. To different controls. I.e. diff production, process,
order types
We need to concentrate on PPO1
Copy from Existing one
√0001
√Copy
Plant 1111
Create / Define Scheduler (OPK2)
SPROà
Productionà
Shop floor controlà Master Dataà
Define Production scheduling profile
Copy Existing (Minimum 3)
Define Production Scheduler OPJ9
SPROà
Productionà
Shop Floor controlà Master Dataà
Define Production Scheduler
Plant 1111
Copy Standard 000001
Profile
100
101
depend as client Requirement we need
to attach links
Production order & Plant link
Define scheduling parameter for production order
OPU3
SPROà
Productionà
Shop floor controlà operationà
schedulingà
Define scheduling parameters for production order
Plant 1111
Enter
We need to attach PPO1 Link between
plant & standard production order
Define confirmation parameters OPK4
SPROà
Productionà
Shop floor controlà operationsà
confirmationà
Define confirmation parameters
Plant
1111
Link between plant and order types
for configuration of production order
|
Otherwise it will not allow for
confirming production order
New entries
Creation of production order:
-
SAP Easy Accessà
Logisticsà
productionà
production controlà Orderà
Createà
COO1 With material
(Verify whether OBYC link is there or
not GBB/VBR for RM)
Finished goods Finished
Plant 1111
Planning plant 1111
Order type PP01
ENTER
Total Quantity Units ea
Finish date …
Enter
Save
[*** There are types of production
order.
Co production orderà
without quantity
PP Production orderà
with quantity
Without giving for production module
order can be raised in CO area]
Release Production order:
- Co 02
SAP Easy Accessà
Logisticsà
Productionà
Production controlà Orderà
Change
Enter
Order No …
Enter
Release Button
Save
Issue of Material to Production
Order: - MB1A
Movement type 261
Plant 1111
Storage location …
Enter
Order No …
Item Material Quantity
1 858 1
1 854 1
Enter
[Issuing Raw Material to production
order]
Save
RM consumption A/c Dr
To RM a/c
Material Doc with above quantity is
generated
To see Mat Doc No
MB03
Mat Doc No …
Enter
We can see that Doc. To see a/c Doc
Put cursor on line item
√√
a/c Doc
RM
consumption A/c Dr
To
RM a/c
OBYC à
GBBà
Specified Raw Material Consumption
Confirmation of Production Order:
-
SAP Easy Access à
Logisticsà
Production à
production controlà confirmationà
Enterà
for order CO15
Order
no …
√ Final confirmation
Enter
Yet to confirm 5 units
Enter
Save
i.e. production
is completed and a value on shop floor.
In OBYC we need to attach one cost of
production a/c
Create cost of production a/c in FS00
P & L A/C
Field status group is G003
√post automatically
Save
OBYC
0001 3000 Cost of production a/c
SPROà
Mat mgmtà
valuation Assignmentà Acct
Determinationà
without wizardà Define a/c groups
for typesà
acct Determination à Production
We can see/give off setting entries
---------------------------THE
END--------------------------------------------------------------
Training in SAP FICO THE CREATING EXPERTS is the one place to get trained and choose your career in SAP courses.
ReplyDeleteTo take a glance at it click the link provided below
http://thecreatingexperts.com/sap-fico-training-in-chennai/
yeah, 4/6 weeks/month industrial training in Noida then you should follow this link
ReplyDeleteyeah great blog about T code on ERP.. if any one looking for Java Android Training in Noida then you can follow the links https://goo.gl/maps/Xvj621YDBuw
ReplyDeletehttps://goo.gl/maps/Xvj621YDBuw
ReplyDeletevery usefull description
ReplyDeleteNice post.
ReplyDeleteSelenium online training
Selenium training
Spark online training
Spark training
splunk admin online training
splunk admin training
splunk development online training
splunk development training
splunk online training
splunk training
sql azure online training
sql azure training
sql plsql online training
sql plsql training
sql server dba online training
sql server dba training
sql server developer online training
sql server developer training
I want to learn sap fico can anybody help me out
ReplyDeleteThanks again for the article post.Really thank you! Fantastic.
ReplyDeletesap wm training
sap fico training
This post is extremely radiant. I extremely like this post. It is outstanding amongst other posts that I’ve read in quite a while. Much obliged for this better than average post. I truly value it! sap fico training fees in hyderabad
ReplyDelete